OEM · Standards
Copper vs Copper-Clad Aluminium Conductors in Lighting Track
Solid copper or copper-clad aluminium (CCA) in lighting track? How to tell them apart on a sample, why it matters for heat and joints, and what to specify.
A track run rarely matches a standard length. The question is where the extra is cut off: on a ladder with a hacksaw, or at the factory, capped and tested before it ships.

Cut-to-length lighting track is track cut at the factory to the exact run lengths of a project, with the ends capped and the conductors set back and tested, so the installer only fixes, feeds and joins it. It removes the most error-prone job on a track installation, cutting and re-terminating on site, and it makes every store or room in a rollout identical. G-Tracks cuts any length from 0.1 m to 6 m at the factory, with no minimum order.
Track is usually stocked in 1, 2, 3 and 4 m lengths. Real ceilings are not designed in metres: a run is set by the shelving, the window, the beam or the grid. A 4.65 m run means either a 4 m length plus a short cut piece, or a 5 m length cut down. Either way, somebody cuts track.
Cutting track on site is allowed by most manufacturers, but it is more than a saw cut:
Done on a ladder, at the end of a long day, each step is a chance for a fault: a burr that scratches every adapter, a conductor that is not set back, an end cap that does not seat. These faults show up later as flickering spots, tripped phases or adapters that will not lock.
If the drawings are not final, order standard lengths for the first store and cut-to-length for the rest once the layout is fixed.
Send the list of lengths per run, the track type, the colour and the parts for each end. Every length is cut, capped and fitted with conductors at the factory, tested for insulation and continuity, labelled, and packed by run or by store if you ask. Lengths from 0.1 m to 6 m, in black or white from stock or any colour to order, with no minimum order.
Yes, most track can be cut on site if the installer follows the manufacturer's instructions: cut square, deburr, bend the conductors back so they cannot touch the end cap, and fit a new end cap. Each step is a chance for a fault, which is why factory cutting is the better default for planned runs.
Any length from 0.1 m to 6 m. Each length is cut, capped and fitted with conductors at the factory, and tested for insulation and continuity before packing.
Measure the finished run from the drawings or on site, deduct the length taken by the feed and end cap given on the datasheet, and split long runs into lengths joined by straight couplers. Send the list of lengths per run with the order.
No. G-Tracks has no minimum order for stock or OEM items, including cut lengths.
Datasheets, samples and OEM versions of every system in this article. No minimum order.